{"id":75539,"date":"2014-07-24T18:43:01","date_gmt":"2014-07-24T08:43:01","guid":{"rendered":"http:\/\/southburnett.com.au\/news2\/?p=75539"},"modified":"2020-08-26T20:03:10","modified_gmt":"2020-08-26T10:03:10","slug":"moreton-triples-coal-estimates","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/","title":{"rendered":"Moreton Triples Coal Estimates"},"content":{"rendered":"<figure id=\"attachment_72757\" aria-describedby=\"caption-attachment-72757\" style=\"width: 200px\" class=\"wp-caption alignright\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-72757\" title=\"Jason Elks\" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks.jpg\" alt=\"\" width=\"200\" height=\"325\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks.jpg 200w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks-185x300.jpg 185w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/><\/a><figcaption id=\"caption-attachment-72757\" class=\"wp-caption-text\">Moreton Resources CEO<BR> Jason Elks<\/figcaption><\/figure>\n<p><strong>July 24, 2014<\/strong><\/p>\n<p>Moreton Resources&#8217; coals reserves at Coolabunia have the quality and tonnage &#8220;to sustain a substantial, long-term mining operation&#8221;, the ASX was told today.<\/p>\n<p>In a statement to the Exchange, Moreton CEO Jason Elks said the results from tests in 42 new holes across the holding had been analysed by an independent consultant.<\/p>\n<p>They showed the &#8220;indicated and inferred&#8221; coal in the area could be upgraded 200 per cent.<\/p>\n<p>The consultants had estimated a total coal resource of 221.2MT within the tenement (including 122.3MT measured and 82.5MT indicated); up from the previous level of 73MT (indicated and inferred).<\/p>\n<p>Mr Elks said Moreton Resources would now move to finalise its preliminary Mine Concept Study to determine how much of the area could be converted into a mining reserve and at what strip ratio.<\/p>\n<p><strong>&#8220;Following which, the company will be in a position to further assess the commercial viability of any decision to further advance the project,&#8221; Mr Elks said<\/strong>.<\/p>\n<p>Moreton hopes to be able to deliver coal suitable for power generation at Tarong at a lower cost than the adjacent Meandu mine.<\/p>\n<p>&#8220;We believe the work currently being carried out will demonstrate that there is a commercial case to consider the (Moreton) asset as a potential alternative supply, be it with the current operator (of Tarong) or a future operator through divestment of power generation assets,&#8221; Mr Elks said.<\/p>\n<p>&#8220;(Moreton) is aware that the incumbent power generator, Stanwell Corporation, states it has sufficient coal to supply the Tarong Power Stations up until at least 2035.&#8221;<\/p>\n<p>He said the company had not entered into commercial negotiations with Stanwell &#8211; or approached any potential acquirer &#8211; other than to advise of Moreton&#8217;s progress.<\/p>\n<p><strong>Mr Elks said a key component of any decision-making would be community engagement and environmental concerns.<\/strong><\/p>\n<p>&#8220;However this is a contemplative project at this stage and is by no means an imminent proposition.<\/p>\n<p>&#8220;We certainly have staff regularly attending the Kingaroy region and talking with stakeholders in a staged process about our activities around community and environment.&#8221;<\/p>\n<p>Moreton Resources is the restructured company formed after the failure of Cougar Energy&#8217;s underground coal gasification trial at Coolabunia.<\/p>\n<p>Mr Elks said that notwithstanding the potential for a coal mine on the site, the new Board of the company remained committed to dismantling and removing the UCG plant and fulfilling its environmental responsibilities.<\/p>\n<ul>\n<li><strong>Related article: <a href=\"http:\/\/southburnett.com.au\/news2\/2014\/06\/coal-mine-review-delayed-to-july\/\">Coal Mine Review Delayed To July<\/a><\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Moreton Resources&#8217; coals reserves at Coolabunia have the quality and tonnage &#8220;to sustain a substantial, long-term mining operation&#8221;, the ASX was told today.<\/p>\n","protected":false},"author":20,"featured_media":72758,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,3],"tags":[152],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Moreton Triples Coal Estimates - southburnett.com.au<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Moreton Triples Coal Estimates - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Moreton Resources&#039; coals reserves at Coolabunia have the quality and tonnage &quot;to sustain a substantial, long-term mining operation&quot;, the ASX was told today.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-24T08:43:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-08-26T10:03:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"182\" \/>\n\t<meta property=\"og:image:height\" content=\"101\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/\",\"name\":\"Moreton Triples Coal Estimates - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2014-07-24T08:43:01+00:00\",\"dateModified\":\"2020-08-26T10:03:10+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Moreton Triples Coal Estimates - southburnett.com.au","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/","og_locale":"en_US","og_type":"article","og_title":"Moreton Triples Coal Estimates - southburnett.com.au","og_description":"Moreton Resources' coals reserves at Coolabunia have the quality and tonnage \"to sustain a substantial, long-term mining operation\", the ASX was told today.","og_url":"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/","og_site_name":"southburnett.com.au","article_published_time":"2014-07-24T08:43:01+00:00","article_modified_time":"2020-08-26T10:03:10+00:00","og_image":[{"width":"182","height":"101","url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/06\/jasonelks2.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/","url":"https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/","name":"Moreton Triples Coal Estimates - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2014-07-24T08:43:01+00:00","dateModified":"2020-08-26T10:03:10+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2014\/07\/24\/moreton-triples-coal-estimates\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/75539"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=75539"}],"version-history":[{"count":3,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/75539\/revisions"}],"predecessor-version":[{"id":273841,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/75539\/revisions\/273841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/72758"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=75539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=75539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=75539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}