{"id":61844,"date":"2014-03-27T22:00:17","date_gmt":"2014-03-27T12:00:17","guid":{"rendered":"http:\/\/southburnett.com.au\/news2\/?p=61844"},"modified":"2020-12-04T14:36:19","modified_gmt":"2020-12-04T04:36:19","slug":"26m-project-to-boost-local-economy","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/","title":{"rendered":"$26m Project To Boost Local Economy"},"content":{"rendered":"<figure id=\"attachment_61846\" aria-describedby=\"caption-attachment-61846\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1.jpg\"><img loading=\"lazy\" class=\"wp-image-61846\" title=\"20140327 Black Creek Diversion \" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-61846\" class=\"wp-caption-text\">Member for Nanang0 Deb Frecklington, Tarong Power Stations Site Manager Dennis Franklin and Site Superintendent Greg Kaarsberg from York Civil Pty Ltd<\/figcaption><\/figure>\n<p><strong>March 28, 2014<\/strong><\/p>\n<p>Work began at the weekend on a $26.3 million construction project at Tarong which should pump at least $7 million into the South Burnett economy.<\/p>\n<p>The Black Creek Dam diversion project will cut a 3.1km long stormwater channel to protect the Tarong power stations\u2019 ash dam from flood damage.<\/p>\n<p>It will re-link the catchment area behind the Black Creek Dam directly to Meandu Creek, bypassing the ash dam and recreating a linkage which had existed up until the 1980s when the ash dam was built.<\/p>\n<p>During the 2011 floods, the Black Creek Dam overflowed for the first time in its life, causing erosion to the adjacent 250ha ash dam.<\/p>\n<p><strong>Tarong Power Stations Site Manager Dennis Franklin said today the ash dam was never at any threat of overflowing in 2011 but the level did rise to a point that triggered a mandatory report to the State Government&#8217;s environmental agency.\u00a0<\/strong><\/p>\n<p>The ash dam was not affected at all by the 2013 floods.<\/p>\n<p>The new diversion channel will ensure that the 2011 situation can&#8217;t happen again because flood water will not flow into the ash dam.<\/p>\n<p>&#8220;This will substantially reduce the risk of the ash dam subsequently overflowing and releasing contaminants into Meandu Creek,&#8221; Mr Franklin said.<\/p>\n<p>The channel will be up to 20m wide in places and will be designed to handle one-in-100 year rainfall events; it has been estimated that 598,000 cu metres of soil will have to be excavated.<\/p>\n<p>Surplus spoil will be used to provide a &#8220;cap&#8221; on the surface of the ash dam.<\/p>\n<p>The channel will also include several \u201cenergy dissipation\u201d structures to slow floodwater down before it enters Meandu Creek.<\/p>\n<p>York Civil has been appointed the external contractors to oversee the construction of the channel.<\/p>\n<p>They have about 25 workers on site at present but this is expected to grow to about 60 as the project progresses.<\/p>\n<p>The diversion channel is scheduled to take about nine months to complete, with workers staying in accommodation in Kingaroy, Nanango and Yarraman.<\/p>\n<p>&#8220;It is estimated that more than $7 million will be spent locally through plant hire, rock, sand, concrete and gravel, accommodation and other services,&#8221; Mr Franklin said.<\/p>\n<p><strong>Member for Nanango Deb Frecklington said the project was a great economic boost for the region but more importantly, it also secured the long-term viability of the ash dam and reinforced the importance of the power stations.<\/strong><\/p>\n<p>&#8220;It provides confidence that we are maintaining them as a source of energy for Queensland into the future,&#8221; she said.<\/p>\n<figure id=\"attachment_61845\" aria-describedby=\"caption-attachment-61845\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek2.jpg\"><img loading=\"lazy\" class=\"wp-image-61845\" title=\"20140327 Black Creek Diversion\" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek2.jpg\" alt=\"\" width=\"740\" height=\"343\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek2.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek2-300x139.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-61845\" class=\"wp-caption-text\">The 3.1km long diversion channel will range in width from 11m to 20m and will be 11m deep<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Work began at the weekend on a $26.3 million construction project at Tarong which should pump at least $7 million into the South Burnett economy.<\/p>\n","protected":false},"author":20,"featured_media":61846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,16,3],"tags":[34,105],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$26m Project To Boost Local Economy - southburnett.com.au<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$26m Project To Boost Local Economy - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Work began at the weekend on a $26.3 million construction project at Tarong which should pump at least $7 million into the South Burnett economy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2014-03-27T12:00:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-04T04:36:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/\",\"name\":\"$26m Project To Boost Local Economy - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2014-03-27T12:00:17+00:00\",\"dateModified\":\"2020-12-04T04:36:19+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$26m Project To Boost Local Economy - southburnett.com.au","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/","og_locale":"en_US","og_type":"article","og_title":"$26m Project To Boost Local Economy - southburnett.com.au","og_description":"Work began at the weekend on a $26.3 million construction project at Tarong which should pump at least $7 million into the South Burnett economy.","og_url":"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/","og_site_name":"southburnett.com.au","article_published_time":"2014-03-27T12:00:17+00:00","article_modified_time":"2020-12-04T04:36:19+00:00","og_image":[{"width":"620","height":"385","url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/03\/20140327blackcreek1.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/","url":"https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/","name":"$26m Project To Boost Local Economy - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2014-03-27T12:00:17+00:00","dateModified":"2020-12-04T04:36:19+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2014\/03\/27\/26m-project-to-boost-local-economy\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/61844"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=61844"}],"version-history":[{"count":17,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/61844\/revisions"}],"predecessor-version":[{"id":288873,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/61844\/revisions\/288873"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/61846"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=61844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=61844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=61844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}