{"id":365866,"date":"2025-10-14T20:27:14","date_gmt":"2025-10-14T10:27:14","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=365866"},"modified":"2025-10-20T18:08:57","modified_gmt":"2025-10-20T08:08:57","slug":"ellesmere-bess-to-double","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/","title":{"rendered":"Ellesmere BESS To Double"},"content":{"rendered":"<figure id=\"attachment_357746\" aria-describedby=\"caption-attachment-357746\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-357746\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3.jpg 740w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3-269x167.jpg 269w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3-285x177.jpg 285w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3-340x211.jpg 340w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3-263x163.jpg 263w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-357746\" class=\"wp-caption-text\">An artist&#8217;s impression of the original Ellesmere BESS proposal, centre, and its proximity to the Halys substation and existing Powerlink transmission lines, at bottom (Artwork: Akaysha Energy)<\/figcaption><\/figure>\n<p><strong>October 14, 2025<\/strong><\/p>\n<p>The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.<\/p>\n<p>The expansion from 500MW to 1120MW was approved by &#8220;delegated authority&#8221; last month which meant it was not put before a Council meeting for discussion.<\/p>\n<p>Akaysha received approval for a Material Change of Use for a block of former grazing land next to Oaky Creek Back Road in 2024.<\/p>\n<p>At that time, BESS projects such as this were &#8220;code assessable&#8221; rather than &#8220;impact assessable&#8221;, so if a project conformed to existing policy, it had to be approved or Council risked an expensive (and probably unsuccessful) legal battle.<\/p>\n<p><strong>The BESS project originally was to cover an area of about 10ha not far from the existing Halys Substation and other electrical infrastructure.<\/strong><\/p>\n<p>The footprint of the project has now expanded to about 15ha.<\/p>\n<p>It will be connected to the substation via a 275kV Powerlink transmission line.<\/p>\n<p>Akaysha has stated previously that it intends to use Lithium Iron Phosphate cell technology at the Ellesmere BESS which it says is safer than lithium-ion technology.<\/p>\n<ul>\n<li><strong>Related article: <a href=\"https:\/\/southburnett.com.au\/news2\/2025\/02\/24\/bess-project-sparks-debate\/\">BESS Project Sparks Debate<\/a><\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size.<\/p>\n","protected":false},"author":20,"featured_media":357746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,22,3],"tags":[1131,459],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Ellesmere BESS To Double - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ellesmere BESS To Double - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-14T10:27:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-20T08:08:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t<meta property=\"og:image:height\" content=\"460\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/\",\"name\":\"Ellesmere BESS To Double - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2025-10-14T10:27:14+00:00\",\"dateModified\":\"2025-10-20T08:08:57+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ellesmere BESS To Double - southburnett.com.au","description":"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/","og_locale":"en_US","og_type":"article","og_title":"Ellesmere BESS To Double - southburnett.com.au","og_description":"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.","og_url":"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/","og_site_name":"southburnett.com.au","article_published_time":"2025-10-14T10:27:14+00:00","article_modified_time":"2025-10-20T08:08:57+00:00","og_image":[{"width":740,"height":460,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/02\/20250222akaysha3.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/","url":"https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/","name":"Ellesmere BESS To Double - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2025-10-14T10:27:14+00:00","dateModified":"2025-10-20T08:08:57+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"The proposed Akaysha Energy Battery Energy Storage System (BESS) project at Ellesmere has more than doubled in size, but South Burnett councillors have their hands tied in regards to the development.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2025\/10\/14\/ellesmere-bess-to-double\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/365866"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=365866"}],"version-history":[{"count":2,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/365866\/revisions"}],"predecessor-version":[{"id":365941,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/365866\/revisions\/365941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/357746"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=365866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=365866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=365866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}