{"id":361441,"date":"2025-06-10T12:57:19","date_gmt":"2025-06-10T02:57:19","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=361441"},"modified":"2025-06-12T14:28:55","modified_gmt":"2025-06-12T04:28:55","slug":"testing-starts-on-first-turbines","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/","title":{"rendered":"Testing Starts On First Turbines"},"content":{"rendered":"<figure id=\"attachment_361442\" aria-describedby=\"caption-attachment-361442\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-361442\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo.jpg 740w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo-269x167.jpg 269w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo-285x177.jpg 285w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo-340x211.jpg 340w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo-263x163.jpg 263w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-361442\" class=\"wp-caption-text\">Six turbines are moving into the testing phase at the Wambo Wind Farm (Photo: Stanwell)<\/figcaption><\/figure>\n<p><strong>June 10, 2025<\/strong><\/p>\n<p>Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm<\/p>\n<p>A Wambo spokesperson said these turbines were now moving into a testing phase which would continue over the next six months.<\/p>\n<p>They will produce a small amount of energy during this phase which will feed into the Queensland grid.<\/p>\n<p>This follows the successful energisation of the new Powerlink substation, which connects the Wambo wind farm to the electricity grid.<\/p>\n<p>A total of 18 turbine towers have now been erected.<\/p>\n<p>Deliveries of components from the Port of Brisbane restarted on May 21 following the incident at the Mount Crosby Road overpass on May 16.<\/p>\n<p>The Wambo Wind Farm is being built in two stages, and will eventually consist of 83 wind turbines and generate more than 500MW of power.<\/p>\n<p><strong>Stanwell CEO Michael O\u2019Rourke said the energisation and commissioning process of Wambo Wind Farm\u2019s first turbines was a significant milestone.<\/strong><\/p>\n<p>\u201cIt\u2019s been over two years since construction started, to get to this point and to see the first blades of the first turbines now spinning and producing renewable energy for the first time is an incredible moment,&#8221; Mr O&#8217;Rourke said.<\/p>\n<p>\u201cStanwell is delivering the project in partnership with Cubico. Under the joint venture, Stanwell will own half of the energy produced and purchase the rest of the power from Cubico under a 15-year agreement.<\/p>\n<p>\u201cOnce stages 1 &amp; 2 are complete, Wambo Wind Farm will produce enough electricity to power the equivalent of 312,000 homes, supporting our industrial and commercial customers and feeding energy into the National Electricity Market.\u201d<\/p>\n<p><strong>Related articles:<\/strong><\/p>\n<ul>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2025\/05\/20\/wind-farm-deliveries-paused\/\">Wind Farm Deliveries &#8216;Paused&#8217;<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2025\/05\/16\/wambo-load-stuck-under-bridge\/\">Wambo Load Stuck Under Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2025\/04\/22\/wambo-transformer-on-its-way\/\">Wambo Transformer On Its Way<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2025\/03\/10\/key-milestone-in-stage-2\/\">Key Milestone In Stage 2<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2025\/01\/28\/first-turbines-at-wambo\/\">First Turbines At Wambo<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2024\/12\/16\/wind-farm-unveils-dashcam-plan\/\">Wind Farm Unveils Dashcam Plan<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2024\/09\/19\/wind-farm-deliveries-to-begin\/\">Wind Farm Deliveries To Begin<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2024\/06\/25\/wind-farm-grants-announced\/\">Wind Farm Grants Announced<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2024\/02\/23\/more-turbines-for-wind-farm\/\">More Turbines For Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2024\/01\/30\/wambo-fund-applications-open-soon\/\">Wambo Fund Applications Open Soon<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/10\/25\/work-starts-on-bigger-better-bess\/\">Work Starts On Bigger, Better BESS<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/06\/22\/powerlink-to-build-another-line\/\">Powerlink To Build Another Line<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/06\/08\/work-starts-on-new-wind-farm\/\">Work Starts On New Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/02\/24\/wind-farm-project-to-start-soon\/\">Wind Farm Project To Start Soon<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2022\/04\/21\/info-night-about-wind-farm\/\">Info Night About Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2022\/03\/18\/stanwell-to-own-half-wind-farm\/\">Stanwell To Own Half Wind Farm<\/a><\/strong><\/li>\n<\/ul>\n<p><strong>[UPDATED]<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm<\/p>\n","protected":false},"author":20,"featured_media":361442,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,3],"tags":[1676],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Testing Starts On First Turbines - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Testing Starts On First Turbines - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-10T02:57:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-12T04:28:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t<meta property=\"og:image:height\" content=\"460\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/\",\"name\":\"Testing Starts On First Turbines - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2025-06-10T02:57:19+00:00\",\"dateModified\":\"2025-06-12T04:28:55+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Testing Starts On First Turbines - southburnett.com.au","description":"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/","og_locale":"en_US","og_type":"article","og_title":"Testing Starts On First Turbines - southburnett.com.au","og_description":"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm","og_url":"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/","og_site_name":"southburnett.com.au","article_published_time":"2025-06-10T02:57:19+00:00","article_modified_time":"2025-06-12T04:28:55+00:00","og_image":[{"width":740,"height":460,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2025\/06\/20250610wambo.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/","url":"https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/","name":"Testing Starts On First Turbines - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2025-06-10T02:57:19+00:00","dateModified":"2025-06-12T04:28:55+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Work has begun on commissioning the first six turbines from Stage 1 at the Wambo wind farm","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2025\/06\/10\/testing-starts-on-first-turbines\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/361441"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=361441"}],"version-history":[{"count":4,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/361441\/revisions"}],"predecessor-version":[{"id":361539,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/361441\/revisions\/361539"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/361442"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=361441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=361441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=361441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}