{"id":340004,"date":"2023-11-06T14:27:54","date_gmt":"2023-11-06T04:27:54","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=340004"},"modified":"2023-11-06T14:30:53","modified_gmt":"2023-11-06T04:30:53","slug":"tenders-sought-for-dam-tunnel","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/","title":{"rendered":"Tenders Sought For Dam Tunnel"},"content":{"rendered":"<figure id=\"attachment_322650\" aria-describedby=\"caption-attachment-322650\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1.jpg\" alt=\"\" width=\"740\" height=\"459\" class=\"size-full wp-image-322650\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1.jpg 740w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1-269x167.jpg 269w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1-285x177.jpg 285w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1-340x211.jpg 340w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1-263x163.jpg 263w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><figcaption id=\"caption-attachment-322650\" class=\"wp-caption-text\">The State Government has called tenders to build an exploratory tunnel for the Borumba Pumped Hydro project<\/figcaption><\/figure>\n<p><strong>November 6, 2023<\/strong><\/p>\n<p>Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.<\/p>\n<p>An Expression of Interest package for contractors interested in undertaking the underground work was released on Friday.<\/p>\n<p>The\u00a0<strong><a href=\"https:\/\/qtenders.epw.qld.gov.au\/qtenders\/tender\/display\/tender-details.do?action=display-tender-details&amp;id=50728&amp;CSRFNONCE=6482AC72438A296579766D8092093672\" target=\"_blank\" rel=\"noopener\">Underground Works &#8211; Tunnel Drilling package<\/a><\/strong> is seeking EOIs from suitably qualified contractors who can design and construct an exploratory tunnel at the project site near Imbil.<\/p>\n<p>The EOI marks a new phase in the exploratory works phase for the Borumba project, expected to run from late 2023 until mid-2026.<\/p>\n<p><strong>The Tunnel Drilling package will gather geological, geotechnical and hydrogeological data to confirm the proposed location for the underground powerhouse and transformers caverns.<\/strong><\/p>\n<p>If the Borumba Project proceeds, the temporary tunnel would\u00a0 likely be converted into one of the access tunnels required in the project design.<\/p>\n<p>The contract will be awarded in August 2024 with work set to begin in November 2024.<\/p>\n<p>Work on the exploratory tunnel drilling package will only occur if and when Queensland Hydro receives all necessary environmental and planning approvals.<\/p>\n<p>If approved, the Borumba Dam pumped hydro project aims to be producing power in 2030.<\/p>\n<p><strong>Related articles:<\/strong><\/p>\n<ul>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/10\/12\/pumped-hydro-passes-new-milestone\/\">Pumped Hydro Passes New Milestone<\/a><\/strong><\/li>\n<li><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/10\/10\/powerlink-releases-first-route-map\/\"><strong>Powerlink Releases First Route Map<\/strong><\/a><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/08\/22\/nats-target-reckless-renewables\/\">Nats Target \u2018Reckless Renewables\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/05\/10\/mayor-calls-on-lnp-to-speak-up\/\">Mayor Calls On LNP To Speak Up<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/04\/28\/about-200-landholders-affected\/\">\u2018About 200\u2019 Landholders Affected<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/04\/27\/powerlink-unveils-draft-routes\/\">Powerlink Unveils Draft Routes<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/04\/26\/powerlink-maps-to-be-released\/\">Powerlink Maps To Be Released<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/02\/28\/draft-powerline-maps-out-soon\/\">Draft Powerline Maps Out Soon<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/02\/27\/use-state-forests-urges-petition\/\">Use State Forests, Urges Petition<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/01\/27\/petition-targets-power-line-plan\/\">Petition Targets Power Line Plans<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2023\/01\/08\/more-sessions-to-discuss-powerlines\/\">More Sessions To Discuss Powerlines<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2022\/12\/08\/powerlink-to-hold-more-meetings\/\">Powerlink To Hold More Meetings<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2022\/08\/11\/public-meetings-for-power-project\/\">Public Meetings For Power Project<\/a><\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.<\/p>\n","protected":false},"author":20,"featured_media":322650,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,3],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Tenders Sought For Dam Tunnel - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tenders Sought For Dam Tunnel - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-06T04:27:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-06T04:30:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t<meta property=\"og:image:height\" content=\"459\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/\",\"name\":\"Tenders Sought For Dam Tunnel - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2023-11-06T04:27:54+00:00\",\"dateModified\":\"2023-11-06T04:30:53+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tenders Sought For Dam Tunnel - southburnett.com.au","description":"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/","og_locale":"en_US","og_type":"article","og_title":"Tenders Sought For Dam Tunnel - southburnett.com.au","og_description":"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.","og_url":"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/","og_site_name":"southburnett.com.au","article_published_time":"2023-11-06T04:27:54+00:00","article_modified_time":"2023-11-06T04:30:53+00:00","og_image":[{"width":740,"height":459,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2022\/08\/20220811borumba1.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/","url":"https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/","name":"Tenders Sought For Dam Tunnel - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2023-11-06T04:27:54+00:00","dateModified":"2023-11-06T04:30:53+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Queensland Hydro is moving forward with plans to dig an exploratory tunnel linked to the proposed Borumba Pumped Hydro Project.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2023\/11\/06\/tenders-sought-for-dam-tunnel\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/340004"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=340004"}],"version-history":[{"count":4,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/340004\/revisions"}],"predecessor-version":[{"id":340009,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/340004\/revisions\/340009"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/322650"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=340004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=340004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=340004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}