{"id":319662,"date":"2022-06-14T22:22:04","date_gmt":"2022-06-14T12:22:04","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=319662"},"modified":"2022-06-16T01:36:15","modified_gmt":"2022-06-15T15:36:15","slug":"floods-leave-20m-repair-bill","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/","title":{"rendered":"Floods Leave $20m Repair Bill"},"content":{"rendered":"<figure id=\"attachment_21683\" aria-describedby=\"caption-attachment-21683\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"wp-image-21683\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7-285x177.jpg 285w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7-263x163.jpg 263w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><figcaption id=\"caption-attachment-21683\" class=\"wp-caption-text\">FLASHBACK: River Road in Kingaroy during the 2013 floods &#8230; while recent wet weather weren&#8217;t as severe as 2013, it has still left Council with an expensive repair bill and an extensive list of road repairs, some of which could take as long as two years to fix (Photo: Peter Verbakel)<\/figcaption><\/figure>\n<p><strong>June 14, 2022<\/strong><\/p>\n<p>Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.<\/p>\n<p>While the costs will be paid through Federal-State Disaster Recovery Funding Arrangements (DRFA), the need to extensively document damage at each site is slowing repair efforts.<\/p>\n<p>A Council spokesperson said work crews were only allowed to carry out temporary road repairs where public safety was at risk.<\/p>\n<p>Complete repairs could not begin until each project received DRFA approval.<\/p>\n<p><strong>Because of this, the Council believes it could take until August to inspect all 4400 roads in its 3000km road network and it could take as long as two years to fully repair all the recent road damage.<\/strong><\/p>\n<p>Since November, more than 2600 sites have been repaired under Emergency Works provisions, with Council staff working overtime and RDOs to address problems.<\/p>\n<p>But last month&#8217;s rain means the region&#8217;s entire road network needs to be inspected again from scratch.<\/p>\n<p><strong>The spokesperson said repairs would again be prioritised for safety.<\/strong><\/p>\n<p>Temporary works would remove safety hazards but motorists should be aware that road conditions would remain at a lower standard for some time.<\/p>\n<p>Council has appointed a sub-contractor crew to clear blocked road culverts around the road network. A second crew will join them early next month.<\/p>\n<p><strong>A contractor has also been engaged to carry out heavy formation grading, gravelling and table drain reshaping on 14 roads:<\/strong><\/p>\n<table border=\"0\" width=\"100%\">\n<tbody>\n<tr>\n<td width=\"50%\">\n<ul>\n<li>Melrose Road<\/li>\n<li>Ironpot Road<\/li>\n<li>Burra Burri Road<\/li>\n<li>Weens Road<\/li>\n<li>Wicks Road<\/li>\n<li>Darley Estate Road<\/li>\n<li>Edenvale South Road<\/li>\n<\/ul>\n<\/td>\n<td width=\"50%\">\n<ul>\n<li>Jerrards Road<\/li>\n<li>Manar Road<\/li>\n<li>Manumbar Road<\/li>\n<li>Old Proston Road<\/li>\n<li>Red Hill Road<\/li>\n<li>Smith Road<\/li>\n<li>Springs Road<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The same contractor will also undertake pavement reconstruction and sealing works on Memerambi-Barkers Creek Road and Nanango-Brooklands Road, with all works planned to be completed by the end of June.<\/p>\n<p><strong>Dig out and repair works will also be carried on the following 18 sealed roads:<\/strong><\/p>\n<table border=\"0\" width=\"100%\">\n<tbody>\n<tr>\n<td width=\"50%\">\n<ul>\n<li>Alford Street East<\/li>\n<li>Burnett Street<\/li>\n<li>Doonkuna Street<\/li>\n<li>First Avenue<\/li>\n<li>Fitzroy Street<\/li>\n<li>George Street<\/li>\n<li>Glendon Street<\/li>\n<li>Haly Street<\/li>\n<li>Henry Street<\/li>\n<\/ul>\n<\/td>\n<td width=\"50%\">\n<ul>\n<li>Industrial Avenue<\/li>\n<li>James Street<\/li>\n<li>Kent Street<\/li>\n<li>Pound Street<\/li>\n<li>River Road<\/li>\n<li>Somerset Street<\/li>\n<li>Stolzenberg Road<\/li>\n<li>Trussell Street<\/li>\n<li>Youngman Street<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Full repairs to another 35 roads have been approved by DRFA. Council has engaged a contractor to carry out these works but a completion date has yet to be set:<\/strong><\/p>\n<table border=\"0\" width=\"100%\">\n<tbody>\n<tr>\n<td width=\"50%\">\n<ul>\n<li>Armstrongs Road<\/li>\n<li>Barrons Road (northbound)<\/li>\n<li>Barrons Road (southbound)<\/li>\n<li>Beils Road<\/li>\n<li>Borcharts Road<\/li>\n<li>Bridget Carroll Road<\/li>\n<li>East Wooroolin Road (northbound)<\/li>\n<li>Findowie Road (eastbound)<\/li>\n<li>Findowie Road (westbound)<\/li>\n<li>Hodges Road<\/li>\n<li>Hoggs Road<\/li>\n<li>Holts Road<\/li>\n<li>Hoopers Road<\/li>\n<li>Jacobsons Road<\/li>\n<li>Lamperds Road<\/li>\n<li>Liesegangs Road<\/li>\n<li>Luck Road<\/li>\n<\/ul>\n<\/td>\n<td width=\"50%\">\n<ul>\n<li>Meehans Road<\/li>\n<li>Mt Wooroolin Road<\/li>\n<li>Ogilvys Road<\/li>\n<li>Old Wondai Road<\/li>\n<li>Raineys Road<\/li>\n<li>Recreation Drive<\/li>\n<li>Ritchings Road (eastbound)<\/li>\n<li>River Road<\/li>\n<li>Shailers Road<\/li>\n<li>Slatterys Road<\/li>\n<li>Smiths Road<\/li>\n<li>Ten Chain Road<\/li>\n<li>Trouts Road<\/li>\n<li>Wenzels Road<\/li>\n<li>Wilsons Road<\/li>\n<li>Wingfields Road<\/li>\n<li>Woodalls Road<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.<\/p>\n","protected":false},"author":3,"featured_media":21683,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22,16,3],"tags":[1131],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Floods Leave $20m Repair Bill - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Floods Leave $20m Repair Bill - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-14T12:22:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-15T15:36:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dafyd Martindale\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dafyd Martindale\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/\",\"name\":\"Floods Leave $20m Repair Bill - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2022-06-14T12:22:04+00:00\",\"dateModified\":\"2022-06-15T15:36:15+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/fe1462de610cb7aeff2e2962d60f4188\"},\"description\":\"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/fe1462de610cb7aeff2e2962d60f4188\",\"name\":\"Dafyd Martindale\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/dafyd\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Floods Leave $20m Repair Bill - southburnett.com.au","description":"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/","og_locale":"en_US","og_type":"article","og_title":"Floods Leave $20m Repair Bill - southburnett.com.au","og_description":"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.","og_url":"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/","og_site_name":"southburnett.com.au","article_published_time":"2022-06-14T12:22:04+00:00","article_modified_time":"2022-06-15T15:36:15+00:00","og_image":[{"width":"620","height":"385","url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/2013floods7.jpg","type":"image\/jpeg"}],"author":"Dafyd Martindale","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dafyd Martindale","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/","url":"https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/","name":"Floods Leave $20m Repair Bill - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2022-06-14T12:22:04+00:00","dateModified":"2022-06-15T15:36:15+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/fe1462de610cb7aeff2e2962d60f4188"},"description":"Heavy rain and flash flooding in November, January, February and May have left the South Burnett Regional Council with a $20 million road repair bill.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2022\/06\/14\/floods-leave-20m-repair-bill\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/fe1462de610cb7aeff2e2962d60f4188","name":"Dafyd Martindale","url":"https:\/\/southburnett.com.au\/news2\/author\/dafyd\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/319662"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=319662"}],"version-history":[{"count":18,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/319662\/revisions"}],"predecessor-version":[{"id":319699,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/319662\/revisions\/319699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/21683"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=319662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=319662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=319662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}