{"id":312315,"date":"2022-01-24T13:20:12","date_gmt":"2022-01-24T03:20:12","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=312315"},"modified":"2023-08-30T16:32:27","modified_gmt":"2023-08-30T06:32:27","slug":"work-starts-on-25m-bridge","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/","title":{"rendered":"Work Starts On $25m Bridge"},"content":{"rendered":"<figure id=\"attachment_232132\" aria-describedby=\"caption-attachment-232132\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge.jpg\"><img loading=\"lazy\" class=\"wp-image-232132\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-232132\" class=\"wp-caption-text\">FLASHBACK: Members of the Mundubbera to Jandowae Roads Working Group chat with Federal MPs Barnaby Joyce and Ken O&#8217;Dowd at the John Peterson Bridge in 2019 (Photo: MJRWG)<\/figcaption><\/figure>\n<p><strong>January 24, 2021<\/strong><\/p>\n<p>Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.<\/p>\n<p>The narrow, single-lane bridge on the Mundubbera-Durong Road, south of Mundubbera, is prone to flooding, cutting a vital freight link between the North and South Burnett regions.<\/p>\n<p>It has also been the site of numerous incidents, including a fatal crash in September 2020 when a 25-year-old man travelling towards Mundubbera crashed off the bridge and died.<\/p>\n<p>The $25 million project to replace the bridge is being jointly funded by the Federal Government ($20 million) and the State Government ($5 million).<\/p>\n<p><strong>Deputy Prime Minister Barnaby Joyce said the new concrete bridge would feature two lanes, guardrails and safer road approaches.<\/strong><\/p>\n<p>\u201cThe project involves replacing the low-level, timber bridge with a higher, wider and longer concrete bridge on a safer, straighter alignment,\u201d he said.<\/p>\n<p>\u201cThe community has called for a replacement bridge and we\u2019re pleased to be able to deliver these improved long-term structural and safety benefits.<\/p>\n<p>\u201cThe replacement works will improve the bridge\u2019s flood immunity to withstand a one-in-100-year flood and maintain network connectivity on this important freight route.<\/p>\n<p>&#8220;As well as being built at a higher level, the new bridge will reduce the need for ongoing maintenance and the posted speed limit will be raised at the crossing from 60km\/h to 100km\/h upon completion.\u201d<\/p>\n<p>Queensland Transport Minister Mark Bailey said the new bridge would bring peace of mind to local residents, delivering a reliable connection over the Boyne River during the wet season.<\/p>\n<p><strong>\u201cThe new John Peterson Bridge will be built about 500 metres west of the existing bridge by Queensland Bridge and Civil,\u201d Minister Bailey said.<\/strong><\/p>\n<p>\u201cAt this location, the new bridge will be on a straighter and safer alignment, shortening the route for drivers by about 700 metres.<\/p>\n<p>\u201cAs part of the upgrade, safety upgrades will be undertaken at the Hawkwood and Beeron roads intersections in addition to tying in the new road alignment.&#8221;<\/p>\n<p>Drivers will continue to use the old bridge while the new one is being built.<\/p>\n<p>Construction is expected to be complete by early 2023.<\/p>\n<p><strong>The Mundubbera to Jandowae Roads Working Group \u2013 formed in 2017 to press for upgrades to the Mundubbera-Durong Road case \u2013 organised a petition in 2019 calling for the replacement of the bridge as well as upgrades and improvements to Mundubbera-Durong Road.<\/strong><\/p>\n<p>This petition garnered more than 2000 signatures.<\/p>\n<p>The RWG had representatives from the\u00a0North Burnett, South Burnett and Western Downs Regional Councils,\u00a0\u00a0Regional Development Australia Wide Bay Burnett, AgForce Queensland,\u00a0Toowoomba Surat Basin Enterprise (TSBE) and the Burnett Inland Economic Development Organisation (BIEDO).<\/p>\n<p><b>Related articles:<\/b><\/p>\n<ul>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2020\/09\/30\/driver-dies-at-notorious-bridge\/\">Driver Dies At Notorious Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\">$25m Funding To Upgrade Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/05\/03\/24m-promise-to-replace-bridge\/\">$24m Promise To Replace Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/04\/26\/20m-promise-to-replace-bridge\/\">$20m Promise To Replace Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/03\/27\/we-lose-kenny-we-lose-the-election\/\">\u2018We Lose Kenny, We Lose The Election\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/03\/05\/roads-group-lobbies-would-be-mps\/\">Roads Group Lobbies Would-Be MPs<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/01\/22\/mp-pushes-for-road-funding\/\">MP Pushes For Road Funding<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/09\/03\/councils-back-push-for-road-upgrades\/\">Councils Back Push For Roads Upgrade<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/01\/29\/roads-group-welcomes-great-start\/\">Roads Group Welcomes \u2018Great Start\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/12\/22\/roads-group-gathers-evidence\/\">Roads Group Gathers Evidence<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/12\/04\/rain-postpones-roads-tour\/\">Rain Postpones Roads Tour<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/11\/mp-rejects-bridge-claim\/\">MP Rejects Bridge Claim<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/11\/bridge-already-underway-alp\/\">Bridge Already Underway: ALP<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/11\/mayor-welcomes-road-announcement\/\">Mayor Welcomes Road Announcement<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/11\/50m-promise-to-upgrade-road\/\">$50m Promise To Upgrade Road<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/10\/push-grows-to-upgrade-road\/\">Push Grows To Upgrade Road<\/a><\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_194918\" aria-describedby=\"caption-attachment-194918\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/11\/20171106boyne.jpg\"><img loading=\"lazy\" class=\"wp-image-194918\" title=\"20171106 Boyne River Bridge\" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/11\/20171106boyne.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/11\/20171106boyne.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/11\/20171106boyne-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-194918\" class=\"wp-caption-text\">FLASHBACK: How things change &#8230; then-South Burnett Deputy Mayor Kathy Duff, then-Member for Callide Jeff Seeney, then-North Burnett Mayor Rachel Chambers, then-Deputy Opposition Leader Deb Frecklington, then-North Burnett Deputy Mayor Faye Whelan and then-LNP candidate for Callide Colin Boyce lobbying for the bridge to be replaced back in 2017 (Photo: Nanango Electorate Office)<\/figcaption><\/figure>\n<figure id=\"attachment_234805\" aria-describedby=\"caption-attachment-234805\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-234805\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-263x163.jpg 263w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-269x167.jpg 269w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-285x177.jpg 285w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-234805\" class=\"wp-caption-text\">The notorious, single-lane, low-level John Peterson bridge (Photo: MJRWG)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.<\/p>\n","protected":false},"author":20,"featured_media":232132,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Work Starts On $25m Bridge - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work Starts On $25m Bridge - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-24T03:20:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-08-30T06:32:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/\",\"name\":\"Work Starts On $25m Bridge - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2022-01-24T03:20:12+00:00\",\"dateModified\":\"2023-08-30T06:32:27+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work Starts On $25m Bridge - southburnett.com.au","description":"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/","og_locale":"en_US","og_type":"article","og_title":"Work Starts On $25m Bridge - southburnett.com.au","og_description":"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.","og_url":"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/","og_site_name":"southburnett.com.au","article_published_time":"2022-01-24T03:20:12+00:00","article_modified_time":"2023-08-30T06:32:27+00:00","og_image":[{"width":620,"height":385,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/03\/20190327bridge.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/","url":"https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/","name":"Work Starts On $25m Bridge - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2022-01-24T03:20:12+00:00","dateModified":"2023-08-30T06:32:27+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Construction work to replace the dangerous John Peterson Bridge over the Boyne River has begun.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2022\/01\/24\/work-starts-on-25m-bridge\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/312315"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=312315"}],"version-history":[{"count":6,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/312315\/revisions"}],"predecessor-version":[{"id":336484,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/312315\/revisions\/336484"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/232132"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=312315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=312315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=312315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}