{"id":259374,"date":"2020-06-09T18:23:30","date_gmt":"2020-06-09T08:23:30","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=259374"},"modified":"2021-06-16T17:42:46","modified_gmt":"2021-06-16T07:42:46","slug":"25m-funding-to-upgrade-bridge","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/","title":{"rendered":"$25m Funding To Upgrade Bridge"},"content":{"rendered":"<figure id=\"attachment_234805\" aria-describedby=\"caption-attachment-234805\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-234805\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-263x163.jpg 263w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-269x167.jpg 269w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge-285x177.jpg 285w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-234805\" class=\"wp-caption-text\">The single-lane, low-level bridge is prone to flooding, severing an important north-south transport link (Photo: MJRWG)<\/figcaption><\/figure>\n<figure id=\"attachment_98541\" aria-describedby=\"caption-attachment-98541\" style=\"width: 200px\" class=\"wp-caption alignright\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2015\/03\/markbailey.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-98541\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2015\/03\/markbailey.jpg\" alt=\"\" width=\"200\" height=\"324\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2015\/03\/markbailey.jpg 200w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2015\/03\/markbailey-185x300.jpg 185w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/><\/a><figcaption id=\"caption-attachment-98541\" class=\"wp-caption-text\">Transport Minister Mark Bailey<\/figcaption><\/figure>\n<p><strong>June 9, 2020<\/strong><\/p>\n<p>Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.<\/p>\n<p>The narrow, single-lane bridge over the Boyne River on the Mundubbera-Durong Road, south of Mundubbera, is prone to flooding, cutting a vital freight link between the North and South Burnett regions.<\/p>\n<p>It also frequently carries heavy stock transports as well as tourists exploring the area.<\/p>\n<p>The funding package includes $5 million from the State Government &#8211; announced on site on Tuesday by Transport Minister Mark Bailey &#8211; and $20 million promised last year from the Federal Government.<\/p>\n<p>The Mundubbera to Jandowae Roads Working Group (RWG) &#8211; formed in 2017 to press the case &#8211; organised a petition in 2019 calling for the replacement of the bridge as well as upgrades and improvements to Mundubbera-Durong Road.<\/p>\n<p>This petition garnered more than 2000 signatures.<\/p>\n<p>The RWG has representatives from the\u00a0North Burnett, South Burnett and Western Downs councils,\u00a0\u00a0Regional Development Australia Wide Bay Burnett, AgForce Queensland,\u00a0Toowoomba Surat Basin Enterprise (TSBE) and the Burnett Inland Economic Development Organisation (BIEDO).<\/p>\n<p>Both the LNP and Labor Party candidates for the electorate of Flynn promised funding to make the bridge upgrade a reality ahead of last year&#8217;s Federal Election.<\/p>\n<p><strong>Replacement of the bridge &#8211; and a realignment of the approach roads &#8211; have been a key concern for farmers and agri-businesses in the western part of the South Burnett for many years.<\/strong><\/p>\n<p>The replacement of the\u00a0John Peterson Bridge was also identified as a\u00a0high priority by local councils and the Wide Bay Burnett Regional Organisation of Councils (WBBROC).<\/p>\n<p>Burnett Pork\u00a0Alliance&#8217;s Russell Bishop said the new bridge would make a significant difference to his business.<\/p>\n<p>\u201cThis investment will save us between $5000 to $10,000 per day during flood events, as well as providing safe\u00a0access for our staff,&#8221; he said.<\/p>\n<p>&#8220;Currently we rely on a boat to ship staff and supplies across the Boyne River during floods.<\/p>\n<p>\u201cIt will mean we will have safer access for our trucks throughout the year and will reduce our anxiety about rain events and their impact on the business.\u201d<\/p>\n<p><strong>RWG chair and AgForce general president Georgie Somerset, North Burnett mayor Rachel Chambers and BIEDO CEO Kristy Frahm attended Tuesday&#8217;s funding announcement.<\/strong><\/p>\n<p>Minister Bailey said detailed designs for the bridge upgrade were in their final stages and when\u00a0complete, construction on the replacement and realignment of the bridge would begin.<\/p>\n<p>Works are expected to get under way during the 2020-21 financial year and create 100 jobs.<\/p>\n<p><b>Related articles:<\/b><\/p>\n<ul>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/05\/03\/24m-promise-to-replace-bridge\/\">$24m Promise To Replace Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/04\/26\/20m-promise-to-replace-bridge\/\">$20m Promise To Replace Bridge<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/03\/27\/we-lose-kenny-we-lose-the-election\/\">\u2018We Lose Kenny, We Lose The Election\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/03\/05\/roads-group-lobbies-would-be-mps\/\">Roads Group Lobbies Would-Be MPs<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/01\/22\/mp-pushes-for-road-funding\/\">MP Pushes For Road Funding<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/09\/03\/councils-back-push-for-road-upgrades\/\">Councils Back Push For Roads Upgrade<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/01\/29\/roads-group-welcomes-great-start\/\">Roads Group Welcomes \u2018Great Start\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/12\/22\/roads-group-gathers-evidence\/\">Roads Group Gathers Evidence<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/12\/04\/rain-postpones-roads-tour\/\">Rain Postpones Roads Tour<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2017\/11\/mp-rejects-bridge-claim\/\">MP Rejects Bridge Claim<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2017\/11\/bridge-already-underway-alp\/\">Bridge Already Underway: ALP<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2017\/11\/mayor-welcomes-road-announcement\/\">Mayor Welcomes Road Announcement<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2017\/11\/50m-promise-to-upgrade-road\/\">$50m Promise To Upgrade Road<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2017\/10\/push-grows-to-upgrade-road\/\">Push Grows To Upgrade Road<\/a><\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_259393\" aria-describedby=\"caption-attachment-259393\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-259393\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads1.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads1.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads1-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><figcaption id=\"caption-attachment-259393\" class=\"wp-caption-text\">North Burnett Mayor Rachel Chambers, Transport Minister Mark Bailey and RWG chair Georgie Somerset at the bridge on Tuesday (Photo: RWG)<\/figcaption><\/figure>\n<figure id=\"attachment_259394\" aria-describedby=\"caption-attachment-259394\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-259394\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads2.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads2.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/06\/20200609roads2-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><figcaption id=\"caption-attachment-259394\" class=\"wp-caption-text\">Heavy transports regularly use the single-lane John Peterson Bridge to ferry freight &#8230; this logging truck crossed the bridge while the latest funding was being announced\u00a0 (Photo: RWG)<\/figcaption><\/figure>\n<p><strong>[UPDATED]<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Years of lobbying has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge <\/p>\n","protected":false},"author":20,"featured_media":234805,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,3,36],"tags":[1134],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$25m Funding To Upgrade Bridge - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$25m Funding To Upgrade Bridge - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-09T08:23:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-16T07:42:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\",\"name\":\"$25m Funding To Upgrade Bridge - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2020-06-09T08:23:30+00:00\",\"dateModified\":\"2021-06-16T07:42:46+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$25m Funding To Upgrade Bridge - southburnett.com.au","description":"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/","og_locale":"en_US","og_type":"article","og_title":"$25m Funding To Upgrade Bridge - southburnett.com.au","og_description":"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.","og_url":"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/","og_site_name":"southburnett.com.au","article_published_time":"2020-06-09T08:23:30+00:00","article_modified_time":"2021-06-16T07:42:46+00:00","og_image":[{"width":620,"height":385,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/05\/20190503bridge.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/","url":"https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/","name":"$25m Funding To Upgrade Bridge - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2020-06-09T08:23:30+00:00","dateModified":"2021-06-16T07:42:46+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Years of lobbying by local residents, political candidates and the Mundubbera to Jandowae\u00a0Roads Working Group has paid off with confirmation of $25 million funding to replace the dangerous John Peterson Bridge.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2020\/06\/09\/25m-funding-to-upgrade-bridge\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/259374"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=259374"}],"version-history":[{"count":10,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/259374\/revisions"}],"predecessor-version":[{"id":300903,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/259374\/revisions\/300903"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/234805"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=259374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=259374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=259374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}