{"id":257486,"date":"2020-04-30T18:16:42","date_gmt":"2020-04-30T08:16:42","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=257486"},"modified":"2020-07-11T10:25:10","modified_gmt":"2020-07-11T00:25:10","slug":"last-blade-locked-in-at-coopers-gap","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/","title":{"rendered":"Last Blade Locked In At Coopers Gap"},"content":{"rendered":"<figure id=\"attachment_257490\" aria-describedby=\"caption-attachment-257490\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1.jpg\"><img loading=\"lazy\" class=\"wp-image-257490\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1-300x186.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1-263x163.jpg 263w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-257490\" class=\"wp-caption-text\">The final turbine blade is hoisted into position last week (Photo: AGL)<\/figcaption><\/figure>\n<p><strong>April 30, 2020<\/strong><\/p>\n<p>The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.<\/p>\n<p>AGL Head of Construction Brian McEvoy said on Thursday the final blade on the 123rd turbine was hoisted into place by crane last Friday.<\/p>\n<p>\u201cThis is a significant milestone for everyone involved in the Coopers Gap Wind Farm project including the owner, the Powering Australian Renewables Fund,\u201d Mr McEvoy said.<\/p>\n<p>\u201cIt continues a process that began in early 2018 and which included transporting more than 1,200 components more than 300 kilometres from the Port of Brisbane over a mountain range to the Darling Downs site, where the giant turbines were assembled and erected.<\/p>\n<p>\u201cThe scale of the achievement is underlined by the fact that each of the blades are more than 60 metres long, the nacelle housing the generating parts weighed 90 tonnes, and they were lifted more than 100 metres into the air hundreds of times to be fitted.<\/p>\n<p>\u201cAbout 200 people from the GE-Catcon consortium worked on site at the peak of construction work but this will wind down to about 20 once operations begin.\u201d<\/p>\n<p><strong>Mr McEvoy said 96 of the 123 turbines had been commissioned and 182MW of power were being generated into the National Electricity Market.<\/strong><\/p>\n<p>The wind farm will gradually ramp up to full capacity of 453MW.<\/p>\n<p>Mr McEvoy said the $850 million project was expected to be completed in the second half of 2020.<\/p>\n<p>\u201cWe could not have got to this point without the strong support from all of our key stakeholders including the Queensland Government, the Western Downs and South Burnett regional councils, local landowners, the Australian Energy Market Operator and Powerlink Queensland,\u201d he said.<\/p>\n<p>\u201cIt\u2019s satisfying to reach this important milestone knowing we\u2019ve done it safely and supporting the community in which we are located by focusing much of our spending on local businesses and contractors.\u201d<\/p>\n<p><strong>Related articles:<\/strong><\/p>\n<ul>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2020\/03\/12\/rain-pushes-back-wind-farm-date\/\">Rain Pushes Back Wind Farm Date<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/12\/17\/wind-farm-celebrates-a-milestone\/\">Wind Farm Celebrates A Milestone<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/10\/24\/agl-boosts-community-fund\/\">AGL Boosts Community Fund<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/08\/01\/biggest-fan-visits-coopers-gap\/\">&#8216;Biggest Fan&#8217; Visits Coopers Gap<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/06\/28\/inside-the-valley-of-the-giants\/\">Inside The Valley Of The Giants<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/06\/24\/coopers-gap-goes-online\/\">Coopers Gap Goes Online<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/06\/14\/wind-farm-ready-to-power-up\/\">Wind Farm Ready To Power Up<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/04\/03\/substation-ready-to-fire-up\/\">Substation Ready To Fire Up<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2019\/03\/13\/wind-farm-opening-pushed-back\/\">Wind Farm Opening Pushed Back<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/12\/19\/blade-delays-slow-wind-farm\/\">Blade Delays Slow Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/12\/04\/first-turbines-erected-at-wind-farm\/\">First Turbines Erected At Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/10\/04\/wind-farm-signs-6-7m-road-deal\/\">Wind Farm Signs $6.7m Road Deal<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/09\/11\/first-components-arrive-at-wind-farm\/\">First Components Arrive At Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/08\/30\/joint-push-to-fix-phone-services\/\">Joint Push To Fix Phone Services<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/06\/04\/wind-farm-work-well-underway\/\">Wind Farm Work Well Underway<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/05\/31\/agl-asks-mps-for-help-to-solve-mobile-problems\/\">AGL Asks MPs For Help To Solve Mobile Problems<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/05\/09\/job-openings-at-wind-farm\/\">Job Openings At Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/03\/14\/kcci-urges-businesses-to-submit-eois\/\">KCCI Urges Businesses To Submit EOIs<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/03\/04\/substation-build-gets-underway\/\">Substation Build Gets Underway<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/03\/council-tells-wind-farmers-to-pay-up\/\">Council Tells Wind Farmers To Pay Up<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2018\/02\/construction-starts-on-wind-farm\/\">Construction Starts On Wind Farm<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2017\/08\/full-steam-ahead-for-wind-farm\/\">Full Steam Ahead For Wind Farm<\/a><\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_257491\" aria-describedby=\"caption-attachment-257491\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine2.jpg\"><img loading=\"lazy\" class=\"wp-image-257491\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine2.jpg\" alt=\"\" width=\"740\" height=\"518\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine2.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine2-300x210.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-257491\" class=\"wp-caption-text\">A crane carefully manoeuvres the final turbine blade into position (Photo: AGL)<\/figcaption><\/figure>\n<figure id=\"attachment_257492\" aria-describedby=\"caption-attachment-257492\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine3.jpg\"><img loading=\"lazy\" class=\"wp-image-257492\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine3.jpg\" alt=\"\" width=\"740\" height=\"406\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine3.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine3-300x165.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-257492\" class=\"wp-caption-text\">The Coopers Gap wind farm turbines tower above farmland near Niagara Road (Photo: AGL)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.<\/p>\n","protected":false},"author":20,"featured_media":257490,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,16,3],"tags":[78],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Last Blade Locked In At Coopers Gap - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Last Blade Locked In At Coopers Gap - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-30T08:16:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-11T00:25:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/\",\"name\":\"Last Blade Locked In At Coopers Gap - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2020-04-30T08:16:42+00:00\",\"dateModified\":\"2020-07-11T00:25:10+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Last Blade Locked In At Coopers Gap - southburnett.com.au","description":"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/","og_locale":"en_US","og_type":"article","og_title":"Last Blade Locked In At Coopers Gap - southburnett.com.au","og_description":"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.","og_url":"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/","og_site_name":"southburnett.com.au","article_published_time":"2020-04-30T08:16:42+00:00","article_modified_time":"2020-07-11T00:25:10+00:00","og_image":[{"width":620,"height":385,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2020\/04\/20200430turbine1.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/","url":"https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/","name":"Last Blade Locked In At Coopers Gap - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2020-04-30T08:16:42+00:00","dateModified":"2020-07-11T00:25:10+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"The Coopers Gap wind farm project has passed a major milestone with the\u00a0completion of construction of the final turbine.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2020\/04\/30\/last-blade-locked-in-at-coopers-gap\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/257486"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=257486"}],"version-history":[{"count":5,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/257486\/revisions"}],"predecessor-version":[{"id":263685,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/257486\/revisions\/263685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/257490"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=257486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=257486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=257486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}