{"id":237563,"date":"2019-06-12T22:30:20","date_gmt":"2019-06-12T12:30:20","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=237563"},"modified":"2020-07-19T16:03:56","modified_gmt":"2020-07-19T06:03:56","slug":"353m-upgrade-planned-at-tarong","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/","title":{"rendered":"$353m Upgrade Planned At Tarong"},"content":{"rendered":"<figure id=\"attachment_237576\" aria-describedby=\"caption-attachment-237576\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam.jpg\"><img loading=\"lazy\" class=\"wp-image-237576\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-237576\" class=\"wp-caption-text\">Tarong and Tarong North power stations showing the ash dam at rear (Photo: Troy O&#8217;Reilly)<\/figcaption><\/figure>\n<p><strong>by Anne Miller<\/strong><\/p>\n<p><strong>June 12, 2019<\/strong><\/p>\n<p>Stanwell Corporation is now officially &#8220;investigating options&#8221; in regards to the construction of a new fly ash plant at Tarong Power Station.<\/p>\n<p>Tuesday&#8217;s State Budget included an allocation of $101.7 million out of a projected\u00a0$353.7 million total cost to design and construct a new fly ash plant &#8220;as well as a range of refurbishments and improvements&#8221;.<\/p>\n<p>However, a spokesperson confirmed on Wednesday that no contract has yet been let and the corporation is still awaiting final State Government approvals.<\/p>\n<p>The construction of a new fly ash plant at Tarong Power Station will ease a long-running headache at the government-owned electricity generator.<\/p>\n<p>Pozzolanic Enterprises \u2013 a subsidiary of Cement Australia \u2013 hauled its last load of fly ash from Tarong and Tarong North power stations in July 2014, putting to an end a saga during which allegations of uncompetitive behaviour were tested at times by both the Australian Competition and Consumer Commission and the Federal Court.<\/p>\n<p>Later,\u00a0Cement Australia and its associated companies were fined $18.6 million (later reduced to $17.1 million and then increased on appeal to $20.6 million) for anti-competitive behaviour over its contracts with Tarong, Tarong North, Millmerran and Swanbank power stations.\u00a0No allegations were made against the power stations.<\/p>\n<p><strong>Pozzolanic was replaced at Tarong and Tarong North by Sydney-based Coal Reuse Pty Ltd.<\/strong><\/p>\n<p>Stanwell struck a 10-year deal with Coal Reuse which\u00a0began operations at Tarong in August 2014.<\/p>\n<p>However, the venture seemed cursed from the start, with initial delays blamed on the need to dismantle equipment linked to the previous contractor.<\/p>\n<p>In July 2015, Coal Reuse announced work to construct a new multi-million-dollar fly ash handling facility at Tarong Power Station was expected to begin soon. In the interim, the company had been using a\u00a0mobile extraction and loading system.<\/p>\n<p>However, when Coal Reuse was placed in liquidation in September 2016, work on the new fly ash plant at Tarong Power Station still had not begun.<\/p>\n<p>Since then, much of the fly ash being created by Tarong Power Station has been stored in the fly ash dam and in voids at the nearby Meandu Mine.<\/p>\n<h2 style=\"text-align: center;\"><strong>* * *<\/strong><\/h2>\n<p><strong>Fly ash is a by-product of the coal-fired power generation process.<\/strong><\/p>\n<p>It can be used to replace or supplement cement in concrete, providing environmental benefits including greenhouse gas emission reductions.<\/p>\n<p>A Stanwell spokesperson said fly ash was expected to play a major role in the concrete market as more sustainable construction became an important issue for consumers.<\/p>\n<p>&#8220;For every tonne of fly ash used instead of one tonne of cement, there is a saving of approximately one tonne of carbon dioxide,&#8221; the spokesperson said.<\/p>\n<p>&#8220;Tarong Power Station currently produces about one million tonnes of fly ash per year,\u00a0which is treated and stored at Meandu Mine in accordance with environmental regulations.<\/p>\n<p>&#8220;Stanwell is investigating options to construct a new fly ash off-take facility at Tarong Power Station to reduce the amount of ash stored on-site in the ash dam.<\/p>\n<p>&#8220;The reuse of what is otherwise a waste product supports the Queensland Government\u2019s Resource Recovery and Waste Strategy.<em>&#8220;<\/em><\/p>\n<p><strong>Related articles:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/southburnett.com.au\/news2\/2016\/12\/07\/stanwell-wont-pay-coal-reuse-debts\/\"><strong>Stanwell Won&#8217;t Pay Coal Reuse Debts<\/strong><\/a><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2016\/11\/16\/stanwell-defends-fly-ash-deal\/\">Stanwell Defends Fly Ash Deal<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/09\/businesses-told-to-stop-trading-with-coal-reuse\/\">Businesses Told To Stop Trading With Coal Reuse<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/09\/fly-ash-firm-in-liquidation\/\">Fly Ash Firm In Liquidation<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/07\/fly-ash-contractor-under-fire-again\/\">Fly Ash Contractor Under Fire \u2026 Again<\/a>\u00a0<\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/06\/coal-reuse-sympathises\/\">Coal Reuse \u2018Sympathises\u2019<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/06\/dehp-investigates-fly-ash-claims\/\">DEHP Investigates Fly Ash Claims<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/06\/application-lodged-to-wind-up-coal-reuse\/\">Application Lodged To Wind Up Coal Reuse<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/southburnett.com.au\/news2\/2016\/06\/06\/accc-seeks-heavier-fine-against-fly-ash-contractor\/\">ACCC Seeks Heavier Fine Against Fly Ash Contractor<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2016\/04\/fly-ash-company-fined-18-6m\/\">Fly Ash Company Fined $18.6 million<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2015\/07\/work-to-start-on-fly-ash-plant\/\">Work To Start On Fly Ash Plant<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2015\/02\/drivers-toast-the-good-times\/\">Drivers Toast The Good Times<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2014\/08\/contractor-begins-10-year-fly-ash-deal\/\">Contractor Begins 10-Year Fly Ash Deal<\/a><\/strong><\/li>\n<li><strong><a href=\"https:\/\/www.southburnett.biz\/archive.php?start_from=334&amp;ucat=&amp;archive=&amp;subaction=&amp;id=&amp;\">ACCC Seeks Public Input On Fly Ash Decision<\/a><\/strong> (SBBiz)<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Stanwell Corporation is now officially &#8220;investigating options&#8221; in regards to the construction of a new fly ash plant at Tarong Power Station.<\/p>\n","protected":false},"author":20,"featured_media":237576,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,16,3],"tags":[34,105],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$353m Upgrade Planned At Tarong - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Stanwell Corporation is now officially &quot;investigating options&quot; in regards to the construction of a new fly ash plant at Tarong Power Station.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$353m Upgrade Planned At Tarong - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Stanwell Corporation is now officially &quot;investigating options&quot; in regards to the construction of a new fly ash plant at Tarong Power Station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-12T12:30:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-19T06:03:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/\",\"name\":\"$353m Upgrade Planned At Tarong - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2019-06-12T12:30:20+00:00\",\"dateModified\":\"2020-07-19T06:03:56+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Stanwell Corporation is now officially \\\"investigating options\\\" in regards to the construction of a new fly ash plant at Tarong Power Station.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$353m Upgrade Planned At Tarong - southburnett.com.au","description":"Stanwell Corporation is now officially \"investigating options\" in regards to the construction of a new fly ash plant at Tarong Power Station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/","og_locale":"en_US","og_type":"article","og_title":"$353m Upgrade Planned At Tarong - southburnett.com.au","og_description":"Stanwell Corporation is now officially \"investigating options\" in regards to the construction of a new fly ash plant at Tarong Power Station.","og_url":"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/","og_site_name":"southburnett.com.au","article_published_time":"2019-06-12T12:30:20+00:00","article_modified_time":"2020-07-19T06:03:56+00:00","og_image":[{"width":620,"height":385,"url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2019\/06\/20190612ashdam.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/","url":"https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/","name":"$353m Upgrade Planned At Tarong - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2019-06-12T12:30:20+00:00","dateModified":"2020-07-19T06:03:56+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Stanwell Corporation is now officially \"investigating options\" in regards to the construction of a new fly ash plant at Tarong Power Station.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2019\/06\/12\/353m-upgrade-planned-at-tarong\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/237563"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=237563"}],"version-history":[{"count":4,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/237563\/revisions"}],"predecessor-version":[{"id":265773,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/237563\/revisions\/265773"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/237576"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=237563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=237563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=237563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}