{"id":227988,"date":"2019-02-08T19:09:48","date_gmt":"2019-02-08T09:09:48","guid":{"rendered":"https:\/\/southburnett.com.au\/news2\/?p=227988"},"modified":"2020-07-24T14:05:51","modified_gmt":"2020-07-24T04:05:51","slug":"six-year-wait-almost-over-at-linville","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/","title":{"rendered":"Six-Year Wait Almost Over at Linville"},"content":{"rendered":"<figure id=\"attachment_21929\" aria-describedby=\"caption-attachment-21929\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3.jpg\"><img loading=\"lazy\" class=\"wp-image-21929\" src=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-21929\" class=\"wp-caption-text\">The 2013 floods caused widespread damage to infrastructure throughout the South Burnett, as well as in the Brisbane Valley (Photo: Richard Pennell)<\/figcaption><\/figure>\n<p><strong>February 8, 2019<\/strong><\/p>\n<p>A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.<\/p>\n<p>The existing plant, constructed in 1970, was forced to close after the 2013 floods damaged the facility.<\/p>\n<p>Since then, Seqwater has supplied drinking water for Linville\u2019s 400 or so residents by tanker from the nearby Kilcoy water treatment plant.<\/p>\n<p><strong>Natural Resources Minister Dr Anthony Lynham said supplying water to residents by tanker had always been an interim solution.<\/strong><\/p>\n<p>\u201cIn the long-term it is more economical, reliable and effective to re-build the Linville plant and ensure local water supply security well into the future,\u201d Dr Lynham said.<\/p>\n<p>\u201cThe new plant will be a larger facility and will house an improved water quality monitoring station to better detect any contaminants in the raw water and have improved treatment capabilities.<\/p>\n<p>\u201cIt will have upgraded filters and ultraviolet disinfection capabilities for added protection.\u201d<\/p>\n<p>The new plant will source its water from a local Brisbane River bore.<\/p>\n<p><strong>Seqwater\u00a0CEO Neil Brennan said early survey work for the project began late last year.<\/strong><\/p>\n<p>Construction is scheduled to begin in July.<\/p>\n<p>\u201cConstruction is expected to take six months, subject to weather conditions, and will involve the removal and replacement of the current plant and its equipment,&#8221; Mr Brennan said.<\/p>\n<p>\u201cDrinking water will continue to be supplied to the Linville community by tanker from the Kilcoy water treatment plant while the new plant is completed.&#8221;<\/p>\n<p>Residents can stay up-to-date with the progress via\u00a0<strong><a href=\"http:\/\/www.seqwater.com.au\/works\" target=\"_blank\" rel=\"noopener\">www.seqwater.com.au\/works<\/a><\/strong><\/p>\n<h2 style=\"text-align: center;\"><strong>* * *<\/strong><\/h2>\n<p><strong>Member for Nanango Deb Frecklington said the Linville community had finally been heard.<\/strong><\/p>\n<p>\u201cI have been asking SeqWater for years when the new plant would be constructed, and all we have seen is delay after delay,\u201d Mrs Frecklington said.<\/p>\n<p>\u201cOriginally, I was told it would be re-constructed in 2016. Instead, the Labor Government have been trucking water into the township every day and people rightly want to know what this has cost taxpayers.<\/p>\n<p>\u201cIt\u2019s great to finally have this win for Linville, but I\u2019ll be asking the Labor Government more questions when Parliament returns on February 12, including the cost-to-date of water cartage and why Linville has had to wait so long for a secure water supply.<\/p>\n<p>\u201cThe community of Linville deserve a medal for the patience they have shown in waiting seven years for this new plant.&#8221;<\/p>\n<p><strong>[UPDATED]<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.<\/p>\n","protected":false},"author":20,"featured_media":21929,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[658],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Six-Year Wait Almost Over at Linville - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Six-Year Wait Almost Over at Linville - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2019-02-08T09:09:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-24T04:05:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/\",\"name\":\"Six-Year Wait Almost Over at Linville - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2019-02-08T09:09:48+00:00\",\"dateModified\":\"2020-07-24T04:05:51+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Six-Year Wait Almost Over at Linville - southburnett.com.au","description":"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/","og_locale":"en_US","og_type":"article","og_title":"Six-Year Wait Almost Over at Linville - southburnett.com.au","og_description":"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.","og_url":"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/","og_site_name":"southburnett.com.au","article_published_time":"2019-02-08T09:09:48+00:00","article_modified_time":"2020-07-24T04:05:51+00:00","og_image":[{"width":"620","height":"385","url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2013\/01\/boonara3.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/","url":"https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/","name":"Six-Year Wait Almost Over at Linville - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2019-02-08T09:09:48+00:00","dateModified":"2020-07-24T04:05:51+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"A $2 million water treatment plant will be built at Linville to secure a long-term water supply for the community, which has been relying on carted water for the past six years.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2019\/02\/08\/six-year-wait-almost-over-at-linville\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/227988"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=227988"}],"version-history":[{"count":13,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/227988\/revisions"}],"predecessor-version":[{"id":266904,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/227988\/revisions\/266904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/21929"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=227988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=227988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=227988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}