{"id":174557,"date":"2017-04-05T00:20:02","date_gmt":"2017-04-04T14:20:02","guid":{"rendered":"http:\/\/southburnett.com.au\/news2\/?p=174557"},"modified":"2020-09-19T16:56:57","modified_gmt":"2020-09-19T06:56:57","slug":"881m-upgrade-for-dam","status":"publish","type":"post","link":"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/","title":{"rendered":"$881m Upgrade For Dam?"},"content":{"rendered":"<figure id=\"attachment_174565\" aria-describedby=\"caption-attachment-174565\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3.jpg\"><img loading=\"lazy\" class=\"wp-image-174565\" title=\"20170404wivenhoe3\" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3.jpg\" alt=\"\" width=\"740\" height=\"460\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3-300x186.jpg 300w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-174565\" class=\"wp-caption-text\">Wivenhoe Dam&#8217;s wall could be raised by either two metres or four metres by 2030, according to a report in Tuesday&#8217;s Brisbane Times (Photo: Somersetpedia.paul)<\/figcaption><\/figure>\n<p><strong>April 5, 2017<\/strong><\/p>\n<p><strong>by Anne Miller<\/strong><\/p>\n<p>Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.<\/p>\n<p>The Brisbane Times is reporting that dam operators Seqwater have a major upgrade of the dam &#8220;in the pipeline&#8221; which could cost taxpayers up to $881 million.<\/p>\n<p>Raising the dam walls four metres would increase the capacity of Lake Wivenhoe by almost a million megalitres, according to the Brisbane Times.<\/p>\n<p>Also included in the upgrade would be a third spillway at the dam wall and the removal of the emergency &#8220;fuse plug&#8221; spillway.<\/p>\n<p>This is not the first time the prospect of raising the dam wall to increase capacity and improve downstream safety has been canvassed.<\/p>\n<p>In 2014, the then-LNP State Government completed a long process to identify flood mitigation options for the Brisbane River catchment.<\/p>\n<p>Potential new dam sites were investigated &#8211; as many as 39 &#8211; which included proposals which could have affected some South Burnett residents.<\/p>\n<p><strong>A prefeasibility investigation then developed a shortlist of three options which were released in December 2014:<\/strong><\/p>\n<ul>\n<li>Increasing the flood mitigation ability of Wivenhoe Dam by raising the dam wall;<\/li>\n<\/ul>\n<ul>\n<li>A new dam on the Brisbane River upstream of Linville; and<\/li>\n<\/ul>\n<ul>\n<li>A new dam on the Lower Warrill Creek near Willowbank<\/li>\n<\/ul>\n<p>The prefeasibility report tested various outcomes for raising the Wivenhoe Dam wall from between 1.5 metres and eight metres, as well as raising the existing spillway and installing a second emergency spillway.<\/p>\n<p>Sadly for the dam proposal, the State Election was held in January 2015.<\/p>\n<p>Not long afterwards &#8211; in February 2015 &#8211; the new ALP Government put on hold the dam proposals at Linville and Willowbank, leaving the Wivenhoe Dam wall adjustment as the only option.<\/p>\n<p>Nothing has been reported since, until Tuesday&#8217;s night claim in the Brisbane Times that the wall will be raised by 2030.<\/p>\n<p>The newspaper also claims that as well as flood mitigation, the upgrade is necessary because Wivenhoe Dam has not met national safety standards since 2002.<\/p>\n<ul>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/2014pdfs\/prefeasibility-investigation-flood-mitigation.pdf\" target=\"blank\">Prefeasibility Investigation Report<\/a><\/strong> (5.9Mb PDF)<\/li>\n<\/ul>\n<p><strong>Related articles:<\/strong><\/p>\n<ul>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2015\/02\/mp-slams-kneejerk-reaction-over-dams\/\">MP Slams &#8216;Kneejerk Reaction&#8217; Over Dams<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2014\/12\/linville-dam-proposal-shortlisted\/\">Linville Dam Proposal Shortlisted<\/a><\/strong><\/li>\n<li><strong><a href=\"http:\/\/southburnett.com.au\/news2\/2014\/04\/premier-pinpoints-sites-for-dams\/\">Premier Pinpoints Sites For Dams<\/a><\/strong><\/li>\n<\/ul>\n<figure id=\"attachment_92461\" aria-describedby=\"caption-attachment-92461\" style=\"width: 740px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/12\/dammap2.jpg\"><img loading=\"lazy\" class=\"wp-image-92461\" title=\"Dam Map\" src=\"http:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/12\/dammap2.jpg\" alt=\"\" width=\"740\" height=\"723\" srcset=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/12\/dammap2.jpg 620w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/12\/dammap2-300x293.jpg 300w, https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2014\/12\/dammap2-50x50.jpg 50w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-92461\" class=\"wp-caption-text\">The three flood mitigation proposals shortlisted in December 2014 (Source: State Government)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.<\/p>\n","protected":false},"author":20,"featured_media":174565,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[16,3,36],"tags":[1134],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.11 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$881m Upgrade For Dam? - southburnett.com.au<\/title>\n<meta name=\"description\" content=\"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$881m Upgrade For Dam? - southburnett.com.au\" \/>\n<meta property=\"og:description\" content=\"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/\" \/>\n<meta property=\"og:site_name\" content=\"southburnett.com.au\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-04T14:20:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-19T06:56:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"385\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Anne Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/\",\"url\":\"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/\",\"name\":\"$881m Upgrade For Dam? - southburnett.com.au\",\"isPartOf\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\"},\"datePublished\":\"2017-04-04T14:20:02+00:00\",\"dateModified\":\"2020-09-19T06:56:57+00:00\",\"author\":{\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\"},\"description\":\"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#website\",\"url\":\"https:\/\/southburnett.com.au\/news2\/\",\"name\":\"southburnett.com.au\",\"description\":\"Kingaroy and South Burnett News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae\",\"name\":\"Anne Miller\",\"url\":\"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$881m Upgrade For Dam? - southburnett.com.au","description":"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/","og_locale":"en_US","og_type":"article","og_title":"$881m Upgrade For Dam? - southburnett.com.au","og_description":"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.","og_url":"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/","og_site_name":"southburnett.com.au","article_published_time":"2017-04-04T14:20:02+00:00","article_modified_time":"2020-09-19T06:56:57+00:00","og_image":[{"width":"620","height":"385","url":"https:\/\/southburnett.com.au\/news2\/wp-content\/uploads\/2017\/04\/20170404wivenhoe3.jpg","type":"image\/jpeg"}],"author":"Anne Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/","url":"https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/","name":"$881m Upgrade For Dam? - southburnett.com.au","isPartOf":{"@id":"https:\/\/southburnett.com.au\/news2\/#website"},"datePublished":"2017-04-04T14:20:02+00:00","dateModified":"2020-09-19T06:56:57+00:00","author":{"@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae"},"description":"Wivenhoe Dam wall could be about to be raised by either two metres or four metres, if news reports published on Tuesday night are correct.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/southburnett.com.au\/news2\/2017\/04\/05\/881m-upgrade-for-dam\/"]}]},{"@type":"WebSite","@id":"https:\/\/southburnett.com.au\/news2\/#website","url":"https:\/\/southburnett.com.au\/news2\/","name":"southburnett.com.au","description":"Kingaroy and South Burnett News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/southburnett.com.au\/news2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/southburnett.com.au\/news2\/#\/schema\/person\/d43a5027bdddc95f54e9c6274d8a57ae","name":"Anne Miller","url":"https:\/\/southburnett.com.au\/news2\/author\/anne-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/174557"}],"collection":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/comments?post=174557"}],"version-history":[{"count":25,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/174557\/revisions"}],"predecessor-version":[{"id":277224,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/posts\/174557\/revisions\/277224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media\/174565"}],"wp:attachment":[{"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/media?parent=174557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/categories?post=174557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southburnett.com.au\/news2\/wp-json\/wp\/v2\/tags?post=174557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}